Beta The Briev beta is out. Free on iPhone via TestFlight — install it in under a minute.

Join the beta ↗
Briev
Live
Business

DR Congo launches solar-battery hub powering Kamoa-Kakula copper mine

The Democratic Republic of Congo inaugurated a solar and battery complex in Lualaba province that now supplies continuous power to the Kamoa-Kakula copper operation.

In Lualaba province, the DRC formally opened a solar-photovoltaic and battery installation that provides the Kamoa-Kakula copper mine with a reliable 60 MW of continuous power. Minister Aimé Molendo Sakombi presided over the event, which celebrated the completion of a hybrid system rated at about 430 MW of peak solar capacity and more than 1,100 MWh of storage. The two private firms, CrossBoundary Energy and Green World Energie, own and operate the facilities and sell electricity to Kamoa Copper under long-term contracts.

Construction started in June 2025, and the plant achieved full capacity by late September, cutting diesel use by roughly 40 % in September compared with earlier months. The project, part of a broader effort to reduce reliance on diesel and unreliable grid power, supports the mine’s expanding smelting operations and aims to lower operating costs. An expansion to add another 60 MW of solar and storage is planned, with completion targeted within 18 months.

Why it matters

The new renewable power hub reduces diesel dependence and operating costs for one of Africa's largest copper mines.

In this story

solar powerbattery storagecopper miningrenewable energyDR CongoKamoa-Kakuladiesel reduction
Get the beta ↗