FlexBase begins construction of massive vanadium flow battery hub in Laufenburg
FlexBase is building a large vanadium redox flow battery facility in Laufenburg, Switzerland, aimed at stabilising the power grid.
FlexBase is erecting a technology centre in Laufenburg that will house a 2.1 GWh vanadium redox flow battery system, intended to help balance Switzerland’s electricity network. The complex will measure 218 m in length, 80 m in width, 25 m deep and 30 m high, and will be clad in a blue solar panel array. By 2029 the installation plans to include 108 VRFB units delivering up to 1.2 GW of power.
CEO Marcel Aumer stresses that the flow-battery design is neither combustible nor explosive, with tanks largely filled with water and a reusable vanadium electrolyte, offering longer life and simpler disposal than lithium-ion alternatives. The largest comparable plant currently operates in China with a capacity of 1 GWh and 200 MW, considerably smaller than FlexBase’s target.
Why it matters
The project could boost renewable energy integration and set a new standard for safe, long-life grid storage in Europe.
In this story
