Flood damage leaves key Nepal districts isolated as road repairs race against Dashain
Heavy rains in late September washed away bridges and roads in several Nepal districts, cutting them off from the national highway network, while repair crews work to restore access.
Continuous rainfall on Sept 24-25 destroyed roads and bridges across central Nepal, isolating districts such as Manang, Mustang, Baglung and Rasuwa from the national road system. In Lamjung, the Dumre-Besisahar-Chame road is open up to Chame, but a concrete bridge over the Marsyangdi river is still underwater, blocking further travel. The Department of Roads is repairing the Myagdi-Mustang corridor, targeting a Monday reopening after reconstructing the Pokharebagar-Gharkhola bridge and clearing landslides.
Work on the Parbat-Baglung link includes diverting the Kaligandaki river and building a retaining wall to replace a washed-away approach road. In Rasuwa, a Bailey bridge will be installed over the Falakhu river within five days, with plans to assess a similar structure over the Bhotekoshi river. The Nepal Army and Armed Police Force are providing support, and officials have pledged that key routes will be operational before the Dashain holidays.
Why it matters
Road closures hinder travel, trade and aid for remote Nepal districts during a major holiday season.
In this story
