Incheon Airport to completely revamp Terminal 1 by 2035 with $129 billion investment
Incheon International Airport announced a full renovation of Terminal 1, slated for completion by 2035 and funded with over 1.77 trillion won.
Incheon International Airport disclosed a comprehensive overhaul of its aging Terminal 1, targeting a 2035 completion date and a budget exceeding 1.77 trillion won. The upgrade will swap out outdated mechanical, electrical, telecommunications and fire-fighting infrastructure installed 25 years ago and convert the baggage handling system to 100 percent screening. Design is slated for completion by September of next year, with ground-breaking planned for 2028, and the work will be staged in at least three zones to maintain operations.
Officials are also weighing a temporary replacement terminal on spare land to allow a full, simultaneous rebuild. The redesign will merge the current six departure and arrival halls into a unified layout and reorganize duty-free and commercial spaces to improve passenger movement. After the renovation, the terminal’s annual capacity is projected to increase from 54 million to 64 million travelers.
Why it matters
The upgrade will boost passenger capacity and modernize safety systems at a key Asian hub.
In this story
