Beta The Briev beta is out. Free on iPhone via TestFlight — install it in under a minute.

Join the beta ↗
Briev
Live
Politics

Gandak River levels drop as Bihar suspends seven engineers for flood response failures

The Gandak River in Bihar has receded sharply while the state government suspended seven engineers for alleged negligence in handling recent floods.

The Gandak River's water level in Bihar has fallen rapidly, dropping 177 cm at Rewaghat to 50 cm below the danger mark and 130 cm at Lalganj, still 52 cm above the danger threshold but expected to fall further. The state Water Resources Department reported that embankments are no longer under pressure and that materials are stocked at breach sites. In response to the recent flooding, seven engineers—including executive engineers Santosh Kumar Prabhakar and Md Sajid Iqbal—were suspended, and chief engineer Kumar Manoj Gupta faces departmental action for alleged negligence linked to damage at the Champaran embankment.

The department blamed laxity, delayed manpower mobilisation, and poor coordination with locals and elected officials. Floods have impacted nearly 9.87 lakh people in 169 gram panchayats across six districts, prompting distribution of over 1.1 lakh polythene sheets and dry ration packets, operation of 324 boats, and deployment of 14 NDRF and 28 SDRF teams for rescue and relief.

Why it matters

It shows how governmental accountability is enforced during disaster response, affecting flood relief for millions.

In this story

Gandak floodengineer suspensionswater level recedingBihar flood reliefembankment damageemergency response negligencepolythene sheets distributionboat evacuationrelief operations
Get the beta ↗